Permits
The tables below provide current permit fee information for water, sewer, and right-of-way work within the City of Huntington. If you have any questions, please contact our office.
Water Utility Permit Fees (View as PDF)
Water Tap Fee
| Tap Size |
Fee |
| 3/4" |
$1,250.00 |
| 1" |
$1,400.00 |
| 1-1/2" |
$4,600.00 |
| 2" |
$4,500.00 |
Water Meter Fee
| Meter Size |
Fee |
| 5/8" |
$360.00 |
| 1" |
$475.00 |
| 1-1/2" |
$950.00 |
| 2" |
$2,000.00 |
| 3" |
$3,300.00 |
| 4" |
$4,300.00 |
| 6" |
$7,100.00 |
System Development Fee
| Meter Size |
Fee |
| 5/8" |
$1,713.00 |
| 1" |
$4,283.00 |
| 1-1/2" |
$8,565.00 |
| 2" |
$13,704.00 |
| 3" |
$25,695.00 |
| 4" |
$42,825.00 |
| 6" |
$85,650.00 |
Inspection Fee
| Type |
Fee |
| Residential |
$35.00 |
| Commercial/Industrial |
$140.00 |
Reconnection Fees
| Type |
Fee |
| Residential |
$50.00 |
Sanitary Sewer Utility Permit Fees (View as PDF)
Wastewater System Development Fee
| Meter Size |
Fee |
| 5/8" - 3/4" |
$2,780.00 |
| 1" |
$6,950.00 |
| 1-1/2" |
$15,846.00 |
| 2" |
$27,800.00 |
| 3" |
$63,940.00 |
| 4" |
$111,200.00 |
| 6" |
$252,980.00 |
Inspection Fees
| Type |
Fee |
| Residential |
$35.00 |
| Commercial/Industrial |
$140.00 |
Reconnection Fees
| Type |
Fee |
| Residential |
$50.00 |
Right-of-Way Permit Fees (View as PDF)
Right-of-Way Permit Fees
| Permit Type |
Fee |
| Right-of-Way |
$15.00 |
Add-Ons
| Type |
Fee |
| Drive Approach |
$5.00 |
| Sidewalk |
$5.00 |
A Right-of-Way Permit also must be obtained for both drive approaches and sidewalks.
Example - If you are building a new house within the City of Huntington Corporate Limits the following permits would need to be obtained:
Right-of-Way ($15.00)
+ Drive Approach ($5.00)
+ Sidewalk ($5.00)
= Total $25.00